AEDIS Draft Facility Master Plan

Below is the link to the entire AEDIS draft document that includes detail of maintaining the status quo by each school.  Also attached is the letter from AEDIS that contains a chart of FMP Conceptual Cost breakdown.  Staff is also working on having a “must fix” list of items by site, but will not have that ready until the day of our board meeting.